Please upload all the below CWI photos: Pre Install: Front Door + All Elevations, Inside garage, inside Conservatory. Glue flow test. Mid Install: Drill In wall, Gun in wall, Drilled Hole, Hole with Bead in it, Airbricks & Core vents if removed fro each elevation. Evidence drilling in garage or conservatory. Evidence if using lance. Post Install: Show all elevations: Filled Holes, Complete Airbricks. electric box and under sink showing no bead escape. Show if garage or conservatory done. Photos showing no bead in loft.
Please upload all the below Extraction photos: Pre Install: All Elevations, Mid Install: Cavity photos and photos of scope in wall, various locations on each elevation Post Install: All Elevations showing Filled Holes, Completed Air bricks, bricks replaced. Photo showing clean loft.
Please upload all the below Loft photos: Pre Install: Loft roll in packing by front door. Loft hatch, Existing depth with tape measure, Survey loft declaration stapled to rafters, Down lights, tanks, vents. 6 photos of current loft. Mid Install: Material being laid x6 photos. Tape showing different height. Covered downlights. Post Install: Whole loft x6 photos. New depth clearing showing 300 mm. Loft warning sign declaration to rafters, Hatch insulated and measured with tape. Hatch open and closed. Draft proofing. Tanks and pipe insulation. Ceilings.
Please upload all the below Panel install photos: Pre Install: Condition of roof tiles in proposed area of install, scaffolding, Mid Install: Rails in place, hooks in place etc. Post Install: Panels installed close up and from ground, bird netting, cable run.
Please upload all the below Panel install photos: Pre Install: Areas of equipment install, Consumer unit and feed, wiring runs Mid Install: In progress photos Post Install: Phots of equipment installed, wiring runs, consumer units